Home / M.P. 1960 nr 59 poz. 281
Order of the Minister of Construction and Building Materials Industry of June 21, 1960, on cost estimates and settlements for construction and assembly works performed in the second half of 1960.
Zarządzenie Ministra Budownictwa i Przemysłu Materiałów Budowlanych z dnia 21 czerwca 1960 r. w sprawie kosztorysów i rozliczeń za roboty budowlano-montażowe wykonywane w drugim półroczu 1960 r.
Type
Order (Zarządzenie)
Status
without status (bez statusu)
Announced
1960-06-21
Entry into force
1960-07-30
Texts
Related acts
References (2)
- Order of the Minister of Construction and Building Materials Industry of June 21, 1960, on the bases for preparing cost estimates for construction and assembly works performed after June 30, 1960.
- Order of the Minister of Construction and Building Materials Industry of April 14, 1958 on contracts for construction and assembly works performed by state enterprises.
Acts referring to this act
- Implementing Regulations: Regulation of the Council of Ministers of September 20, 1957, on the detailed determination of the scope of activities of the Minister of Construction and Building Materials Industry and the delimitation of jurisdiction in this field.
- Amended Acts: Order of the Chairman of the Committee for Construction, Urban Planning and Architecture of November 15, 1960, supplementing the order of the Minister of Construction and Building Materials Industry of June 21, 1960, on cost estimates and settlements for construction and assembly works in the second half of 1960.
- References: Regulation of the Chairman of the Committee for Construction, Urban Planning and Architecture and the Minister of Finance of January 21, 1961, on the temporary method of settlement for construction and assembly works performed by state enterprises and labor cooperatives in the first quarter of 1961, which do not have cost estimates recalculated to prices in force from July 1, 1960.
- References: Order of the Minister of Construction and Building Materials Industry of June 21, 1960, on overhead rates for direct normative costs and the principles for accounting for additional costs of construction and assembly works.
- References: Order of the Minister of Construction and Building Materials Industry of June 21, 1960, on the bases for preparing cost estimates for construction and assembly works performed after June 30, 1960.
- References: Order of the Chairman of the Committee for Construction, Urban Planning and Architecture of November 21, 1960, concerning cost documentation for construction and assembly works performed in 1961.
- References: Order of the Chairman of the Committee for Construction, Urban Planning and Architecture of May 9, 1961, on the approval of the Catalogue of prices for typical objects - Part I, Volume 1.